integration/

directory
v6.23.0+incompatible Latest Latest
Warning

This package is not in the latest version of its module.

Go to latest
Published: Dec 22, 2016 License: Apache-2.0

README

CLI Integraition Tests

These are high-level tests for the CLI that make assertions about the behavior of the cf binary.

These tests require that a cf binary built from the latest source is available in your PATH.

How to run:

These tests rely on ginkgo to be installed. Currently there are three suites of functionality, isolated, global, and plugin. The isolated suite can run it's tests in parallel, while the global and plugin suites cannot.

Run command for the isolated suite:

ginkgo -p -r -randomizeAllSpecs -slowSpecThreshold=120 integration/isolated

Run command for the global and plugin suites:

ginkgo -r -randomizeAllSpecs -slowSpecThreshold=120 integration/isolated integration/plugin
Customizations (based on environment variables):
  • CF_API - Sets the CF API URL these tests will be using. Will default to api.bosh-lite.com if not set.
  • SKIP_SSL_VALIDATION - If true, will skip SSL Validation. Will default --skip-ssl-validation if not set.
  • CF_USERNAME - The CF Administrator username. Will default to admin if not set.
  • CF_PASSWORD - The CF Administrator password. Will default to admin if not set.
  • CF_CLI_EXPERIMENTAL - Will enable both experimental functionality of the CF CLI and tests for that functionality. Will default to false if not set.
The test suite does not cleanup after itself!

In order to focus on clean test code and performance of each test, we have decided to not cleanup after each test. However, in order to facilitate clean up scripts, we are trying to keep consistent naming across organizations, spaces, etc.

Directories

Path Synopsis
assets

Jump to

Keyboard shortcuts

? : This menu
/ : Search site
f or F : Jump to
y or Y : Canonical URL